WM: Unit of Measure Control at the Material Level

Description

The decision regarding in which unit of measure a material is managed in Warehouse Management was taken, up to now, using the 2 proposed units of measure that were entered in the section Customizing of warehouse number. According to these rules, the unit of measure was decided for all materials.

As of Release 4.0, there is another proposed unit of measure, in addition to the two default proposals, at the material level so that material-specific control is possible. This new field can be maintained in the Warehouse Management view of the material master.