Deleted modules in the Project System IMG
structure
Description
In Release 4.0A the following IMG have been deleted, since the
Project System implementation guide has been restructered in
accordance with the component hierarchy.
CHAPSIMG_CMMENUOLPRUMFE Basic Settings: Accounting
CHAPSIMG_OLPR_FINANZEN Setup Project Cash Management
SIMGSIMG_OLPR_OPS2 Maintain texts for relationship types
CHAPSIMG_OLPR_PROJPLG Project Planning
CHAPSIMG_OLPR_PLGALLG Graphics
CHAPSIMG_OLPR_KOSEINST Basic settings (costs)
CHAPSIMG_OLPR_PLANLAY Planning Layouts
CHAPSIMG_OLPR_GRUNDERL Basic settings (Revenue)
CHAPSIMG_OLPR_PLANZUSCHL Overhead Surcharges (Planned)
SIMGSIMG_OLPR_KA06_1 Edit Overhead Cost Elements
CHAPSING_OLPR_KALKSCHEM Edit Costing Sheet
SIMGSIMG_OLPR_KZS2 Define Costing Sheet
SIMGSIMG_OLPR_KZB2 Define Calculation Base
SIMGSIMG_OLPR_KZZ2_1 Define Percentage Surcharge
SIMGSIMG_OLPR_KZM2_1 Define Quantity-Based Surcharge
SIMGSIMG_OLPR_KZE2 Define Credit
SIMGSIMG_OLPR_TCJ41_04 Assign Costing Sheet/Overhead key to
Project profile
SIMGSIMG_OLPR_TCK05_NP_1 Assign Costing Sheet to Valuation
Variant
SIMGSIMG_OLPR_CJ8V_1 Define Selection Variants for
Collective
Processing
SIMGSIMG_OLPR_KANK3 Define Number Ranges for Planned
Overheads
CHAPSIMG_OLPR_PROJREAL Project Execution/Integration
SIMGSIMG_OLPR_CJ8VABR Edit Selection Variants for
Collective
Processing
CHAPSIMG_OLPR_PS-SD Project with Sales Order
CHAPSIMG_CMMENUOLPRR130 User-Defined Display Variants for
Line-Item
Reports
SIMGSIMG_CFMENUOLPRCJ73 Configure Actual Costs/Revenues and
Finance Line
SIMGSIMG_CFMENUOLPRCJ75 Configure Commitment Line-Item
Reports