Development, quality assurance and production system

Prerequisites

When you configure a 3 system group, you can specify for each R/3 System which role it has in the system group. The transport routes are generated automatically.

Procedure

To configure the transport routes for a development, quality assurance, and production system, proceed as follows:

If you use the "Standard configuration" function, all previous configurations for all R/3 Systems are replaced by the standard settings. Development classes or transport layers which already exist or objects created in the R/3 System are deleted.

  1. In the graphical list editor, choose Configuration ® Standard config.
  2. The Change Transport Routes dialog box appears.

  3. Select 3 system group and choose Continue.
  4. Enter the names of your R/3 Systems and choose Continue.
  5. Your R/3 Systems and their transport routes are displayed in the graphical editor in the display area.

  6. Save the configuration.
  7. To check the transport route configuration, choose Configuration ® Check ® All systems.
  8. To distribute the transport route configuration to all R/3 Systems involved, choose Configuration ® Distribute.
  9. To activate the configuration, choose Configuration ® Activate ® In all systems.

When doing so, you must enter your user ID and password in all R/3 Systems that are to be changed.

Result

The development, quality assurance, and production system have been configured and are connected to each other by transport routes (consolidation route, delivery route).

The transport route configuration was distributed to and activated in all R/3 Systems involved.