Process: Debit Position Rental Unit

Below follows a description of the processes required for the vacant rental units debit position business process in R/3 Real Estate.

  1. Only vacant and released rental units without deletion flag participate in the debit position (system status Vacant or Released).
  2. This requires that a reference flow type has been defined in Real Estate Customizing for each condition type with the relationship type Vacant.
    Conditions that do not have any reference flows are not posted if vacant.

  3. To ensure regular debit position runs, you should have your system administrator create a background job that automatically starts the debit position in the required intervals.
    Afterwards, make sure to control the error log to display and correct possibly occurred errors.

The result of the debit position is: