R/3 ® R/2

Purpose

An ABAP program of an R/3 System starts an ABAP program of an R/2 System under DCAM or UTM in the BS2000 host and exchanges data with this program via CPI-C.

Prerequisites/Procedure

The configuration requirements for this constellation are:

For more details, refer to the section BS2000 Host Systems.

For more details, refer to the section SAP Gateway under BS2000.

RFC connections:

CPI-C connections:

For more details, refer to the section "Side InfoTables" in the topic Side Information in R/3: TXCOM