Assigning a Different Material

You can assign a different material (co-product) to the inspection point as follows:

  1. Call the Other material function.
  2. The system displays a dialog box.

  3. You have three options:
  4. – If co-products have been planned in the order, you can call a list of materials with the possible entries help and select a different material.

    – If no co-products have been planned in the order, enter a material (unplanned co-product).

    – If you do not want to assign a material to the inspection point, mark the No material field.

  5. Choose ENTER to return to the valuation and partial lot assignment screen.

See also:

Refer to the documentation PP - Production Orders for detailed information on co-products.