Selecting a Different Partial Lot

The partial lot that was last processed (if partial lots already exist) is always proposed as a default when the inspection point is confirmed.

If further partial lots exist for an inspection point, you can use the Choose other partial lot function to choose a partial lot from a list of further partial lots.

If you have created a new partial lot before you call the function, the new partial lot is deleted automatically when you select a partial lot from the list.